The water plant capacity is 600 liter/second, serving Menouf, Sers El- Layan and El-Bagour cities. The project contains the civil works of the plant, water intake, inlet & outlet pipelines. The inlet line is 4 Km. long with a 1000 mm in diameter and the outlet is 12 Km with 800 mm in diameter .